Cranes and ocean giants

The finishing touch – three Liebherr mobile cranes from Ulferts GmbH hoist material on board a completed Meyer Werft luxury liner in the harbour at Emden.

Visiting giants

The difficulty with this job was actually to spread the load evenly over the twenty suspension points

Says Jürgen Peters in an interview. He is responsible for large crane jobs at Nolte.

The general fitting out team required space parallel to the set-up areas for the cranes.

Urgent work in the construction dock – when time is at a premium and the gantry cranes are working on other things, an LTM 1130-5.1 has sometimes had to install the enormous ship’s screw.