Mobile and crawler cranes

8 minutes | magazine 01/2022

Smart and stable with Y

Into the future with Terminal 3

An LTM 1090-4.2 installs coloured concrete façade elements on Pier H.

Y-shaped supports deliver stability and flair

Aileen Kempf discusses the next crane jobs for installing concrete façade elements on site.

Experts for the complete prefabricated component process – Carina Wehner and Michael Metz. In the background you can also see the new tower for Terminal 3, which has also been built by the Schick Group.

Frankfurt Airport

Terminal 3

This may be of interest to you

Download

Product area mobile and crawler cranes

Our magazine