Mobile and crawler cranes

6 minutes | magazine 01/2018

Energy revolution 2.0 – the green electricity storage facility

An important pilot project for global energy supplies

Crane driver Ralf Karras from Max Bögl has christened his LTM 11200-9.1 "Hercules" out of respect.

Hand-in-hand with Mother Nature

The Gaildorf green electricity storage pilot project

The fact that this site represents a whole new chapter of the energy revolution is not an everyday occurrence, even for experienced wind power professionals.

Johannes Kaltner, Overall Project Manager

This may be of interest to you

Download

Product area mobile and crawler cranes

Our Magazine