Mobile and crawler cranes

5 minutes - magazine 02 | 2024

Compact. Flexible. Strong.

Space miracle: LR 11000 The overview shows the cramped conditions on the construction site on the banks of the Danube. Made up for by good positioning and the folding ballast frame V-Frame®.

Narrow point: In order to be able to swing past the new abutment with the 450 tonne suspended ballast, the radius over the folding frame had to be reduced.

Self propelled modular transporter: The new bridge construction was transported with two SPMT units from the pre-assembly site to the lifting position of the crane.

V-Frame® enables swivelling process

Mission accomplished: The new bridge is in place – time for a group photo (from left to right): Marco Wilhelm, Philip Eberlein, Tim Lippa, Nancy Koch, Sylvio Hieronymus, Jochen Wiesbauer, Joachim Göckelmann, Mathias Frenz and Tim Moll

This may be of interest to you

Download

Product area mobile and crawler cranes

Our magazine