Coming back for his third Conexpo with Liebherr, Jayson Cody has had a helping hand in every process of the show for Liebherr’s Earthmoving division. As a District Support Representative for Liebherr’s Earthmoving division, Jayson assists in pre-show planning, assembling machines to prepare them for display, providing on-site support for all machines within his division as well as disassembly. Jayson puts in a large amount of work behind the scenes up to one year ahead of the show.
Once on-site, it is time for assembly and final touches to the machines. Jayson mentions, “Getting the machines trade show ready and placed at the show site can be challenging for sure. On the other hand, it is also very rewarding to watch everything come together.”
When asked what his favorite part of ConExpo is, Jayson said, “Teardown and moveout because this stage represents a successful show took place, and I can relax a bit while sending my divisions machines to their prospective destinations.”
You can meet Jayson within the Earthmoving area at the Liebherr outdoor booth!

10/19/2026
Press releases
Liebherr LR 11350 erects the world’s tallest wind turbine
At the end of September, what is now the world’s tallest wind turbine was completed. A Liebherr LR 11350 crawler crane from Schmidbauer GmbH & Co. KG was used in the construction of the prototype of the so-called GICON high-altitude wind turbine in Lusatia, Brandenburg.

10/19/2026
Press releases
An investment of more than € 40 million euros, 12,000 m² of new space and 400 employees at the site by the end of 2026 are the impressive figures of Liebherr-Aerospace’s activities in Campsas, near Toulouse (France), where the company has officially opened its new industrial center of excellence for aerospace heat transfer equipment.

10/16/2026
Press releases
A historic suspension railway carriage is once again gliding through Wuppertal: using a Liebherr LTM 1450-8.1 mobile crane, Franz Bracht Kran-Vermietung GmbH lifted carriage 76, weighing around seven tonnes, into Wuppertal Central Station. Given the limited space available, precise operational planning and modern mobile crane technology were crucial.