Search
Search text
Results 371-380 of 390
Liebherr annual report 2023: Highlights
The globally active Belgian company will use the crane for handling offshore wind turbine components, emphasising its robust capacity.
https://www.liebherr.com/en-int/group/annual-reports/annual-report-2023/highlights-3935258
All-electric LS 800 E ship cranes for SAL "Orca" project
The LS 800 E will be the most advanced ship crane in its segment”, comments Gregor Levold, General Manager Sales for Liebherr Offshore, Ship and Port Cranes.
Liebherr annual report 2022: Highlights
Driven by the energy transition, unit weights are increasing, especially for machinery intended to handle offshore wind turbines.
Slewing bearings and slew drives
Examples here are offshore industry, as well as for oil and gas applications. Application-specific and customized slewing bearing solutions are key values to the product range.
https://www.liebherr.com/en-int/components/solutions/slewing-bearings-and-slew-drives-5373809
Liebherr-MCCtec GmbH remains sustainable at Gold Level
In the near future, alternatives to the proven electrohydraulic drive concept will also be offered for marine and offshore cranes.
Applications
Whether for onshore or offshore: Liebherr offers appropriate solutions for each and every operational stage of international pipeline projects. Do you prefer a used machine?
https://www.liebherr.com/en-int/earthmoving/applications-5376927
Green technology
The Maritime Division produces a wide range of ship cranes, port cranes, offshore cranes and floating cranes. Groundbreaking technologies from Liebherr.
https://www.liebherr.com/en-int/maritime-cranes/corporate-responsibility/green-technology-5391750
Liebherr Annual Report 2021: Development and outlook
The first fully electric offshore crane from Liebherr is now also in development, bringing electric drive systems to yet another area of the company’s product portfolio.
In focus
Andersen, a Danish giant who, at the age of 66, is still extremely dynamic and normally very cheerful, is the jack of all trades in Østerild, a rambling test site for offshore wind turbines.
https://www.liebherr.com/en-int/mobile-and-crawler-cranes/customer-magazine/in-focus-5387419
Liebherr helps shape one of Germany’s first low-emission construction projects
The network connects green hydrogen production and import sources − such as offshore wind energy − with industrial consumption centres, including steel and chemical plants, as well as underground storage


