Search
Search text
Results 2531-2540 of 3,437
Employee Interview | Gary Chatell | President Liebherr Gear and Automation Technologies, Inc.
We’re taking the first steps and hopefully, I can set off a change that the next generations will continue. In the past, I had always worked for Japanese corporations.
Liebherr Academy | Machine Training Center | Liebherr
The corrected measurement data is then transmitted to the gear cutting machine via the general data exchange (GDE) interface and displayed there.
Evotion 2023 | Research Project ZIRKEL
Due to the relatively low quantities and large number of variants from diverse manufacturers and product generations, many disassembly and remanufacturing processes still take place manually today.
Evotion 2023 | Dosing and adhesive bonding applications in battery pack assembly
When applying material, the challenge is therefore generally to maintain control via the dosing parameters. This ensures an even application throughout the entire dosing process.
Liebherr at IFAT 2024 in Munich
The new material handling machine with an operating mass of around 45 tonnes is specially designed for handling bulk and general cargo in port operations and is characterised by very high loads combined
https://www.liebherr.com/en-int/n/liebherr-at-ifat-2024-in-munich-82232-3935641
Largest order in the company’s history: 475 Liebherr machines to be delivered to Fortescue
The contract with Fortescue will also generate ongoing business in the area of after-sales and services across various product segments of the Group.
Record-breaking large crane
In addition to the general crane controls, I was also responsible for programming the displays and controls in the LICCON monitor and PLC control system for the remote control lowering system.
The perfect lift - Crane Planner 2.0
"We create software for mobile devices, desktop systems, next-generation consoles and mixed reality environments, and know how to build virtual worlds, " explains Christian Rathemacher.
https://www.liebherr.com/en-int/group/magazine/crane-planner/crane-planner-3935596
Alternative drive systems: where we are heading
However, solutions involving battery-powered or plug-in construction machines will only help prevent climate change if the power is generated from renewable sources.
Service Engineer - Liebherr Gear Technology
Comply with all state, local, and customer safety requirements (general safety, electrical discharge awareness/arc-flash, quality system awareness, and lock-out tag-out).
https://www.liebherr.com/en-int/j/careers/job-vacancies/75056-en-5370610

