Search
Search text
Results 2121-2130 of 3,339
The company Nouvelles Carrières d’Alsace (N.C.A) once again opts for Liebherr quality
The choice fell on a high-performance machine with optimised loading cycle times Increased productivity with a new Generation 8 excavator Nouvelles Carrières d'Alsace and Liebherr enjoy a long-term partnershipThe
Liebherr-Aerospace: Eco-responsibility in MRO means performance
In parallel, our teams are working on state-of-the-art Digital Smart MRO solutions enabling to generate more value while consuming fewer resources due to leaner direct processes,” explains Sven Dicke,
Liebherr’s domestic appliances division publishes its third Corporate Responsibility Report
If we consider the ecological footprint of a highly energy-efficient refrigerator-freezer over its entire service life (materials used, production, use, recycling), two thirds of the emissions are generated
Conquering the world with Spartacus
The focus thereby lies on the new LPI gearbox generation and the slewing bearing portfolio.
https://www.liebherr.com/en-int/n/conquering-the-world-with-spartacus-25485-3935641
Liebherr delivers the first armoured mobile and recovery cranes to the German Army
Its two recovery winches and a towing hitch at the rear enable it to rescue and tow a wide range of different vehicles such as the new generation of armoured control and command vehicles, armoured transport
The Liebherr R 920 crawler excavator for less regulated markets at Bauma China 2018
The concept of the Liebherr R 920 is based on European standards and aims to improve reliability, as well as generate even higher productivity on the construction site – with lower fuel consumption at
The complete solution – Liebherr tower cranes build Axel Springer new building in Berlin
German building contractor Züblin is the general contractor for the Axel Springer new building.
Liebherr-Aerospace Toulouse SAS Cooperates with IoT Valley
Nicolas Perrier, Head of General Methods Department, commented: “This partnership with IoT Valley will enable Liebherr-Aerospace Toulouse to tap the expertise of start-ups and encourage us to be more reactive
Customers from more than 80 countries experienced two world premieres at the Customer Days in Ehingen
This type of work generally requires luffing jibs and derrick systems.
The Liebherr LH 50 M Industry Litronic material handler at Elmia Wood 2017
The ERC energy recovery system not only brings about a huge increase in performance and a greater handling capacity, it also generates fuel savings of up to 30 per cent, lowers operating costs and reduces









