Search
Search text
Results 1811-1820 of 3,439
The new Liebherr crawler excavator R 926 Compact
The engine delivers an output of 120 kW/163 HP and like all the Liebherr engines on the latest-generation machines, it meets stage IIIB exhaust emission standards.
https://www.liebherr.com/en-int/n/the-new-liebherr-crawler-excavator-r-926-compact-22812-3935641
Telescopic Axis for Facilities with Low Ceilings
The company manufactures gear hobbing machines, gear-shaping machines, generating and profile grinding machines and gear-cutting tools.
https://www.liebherr.com/en-int/n/telescopic-axis-for-facilities-with-low-ceilings-22734-3935641
For specialists from specialists: Liebherr-Aerospace at Airbus Helicopters’ TechDay
Increased efficiency and weight reduction Another solution for an optimized system architecture of helicopters is the application of decentralized hydraulic power generation by highly efficient hydraulic
Liebherr and COMAC sign Letter of Intent
Intent covers spare parts provisioning regarding the air management and landing gear system of ARJ21 and C919 aircraft programs.Representatives of COMAC and other companies as well as Julien Moll, General
https://www.liebherr.com/en-int/n/liebherr-and-comac-sign-letter-of-intent-22541-3935641
Nine axles for Saudi Arabia: Bin Quraya adds an LTM 1750-9.1 to its crane fleet
Its activities focus on work on oil platforms, laying pipelines, general construction work as well as major projects. ",
First PR 776 mining dozer in Indonesia
considerable fleet operating all over the globe, it was finally time for Indonesian miners to start experiencing the major advantages the PR 776 would bring to their operations”, stated Max Muench, General
https://www.liebherr.com/en-int/n/first-pr-776-mining-dozer-in-indonesia-22105-3935641
A new chapter for river logistics with two all-electric CBG 500 E cranes
The next‑generation barges on which the cranes are installed further reinforce this focus on efficiency.
LR 1800-1.0: First job in wind farm
However, this modern crawler crane first had to tackle a job in a wind farm.A dizzying height – the giant Enercon wind turbine has a hub height of 160 metres, a rotor diameter of 138 metres and can generate
https://www.liebherr.com/en-int/n/lr-1800-1-0-first-job-in-wind-farm-21853-3935641
DEME’s Orion arrives at Liebherr factory in Rostock
Liebherr is now jointly managed by the second and third generations. This continuity characterizes the group of companies and is a solid basis for its success.
https://www.liebherr.com/en-int/n/deme’s-orion-arrives-at-liebherr-factory-in-rostock-21702-3935641
Liebherr strengthening its LTM 1750-9.1 mobile crane
So, for example, more than 10 tonnes of additional load capacity can be generated for the mounting of wind turbines on 90 and 100 metre-high towers.
https://www.liebherr.com/en-int/n/liebherr-strengthening-its-ltm-1750-9-1-mobile-crane-21695-3935641









