Search
Search text
Results 1061-1070 of 3,437
Liebherr gas engine portfolio premiering at G-Power 2018
Liebherr gas engine portfolio premiering at G-Power 2018 From 3 to 5 May 2018, Liebherr Components premieres at the International Power and Generating Sets Exhibition (G-Power) in Shanghai (China).
KAMAZ-Master challenges Dakar 2018 and wins again
KAMAZ-Master challenges Dakar 2018 and wins again Dakar race 2018 was the 40th in general rally-marathon that covered the territories of three countries – Peru, Bolivia and Argentina.
https://www.liebherr.com/en-int/n/kamaz-master-challenges-dakar-2018-and-wins-again-21035-3935641
Liebherr LR 1600/2 crawler crane lets Airbus A-300 “fly”
The aircraft will now become a museum exhibit on show to the general public.
Liebherr annual report 2022: Interview with family shareholders
Patricia Rüf: Generally speaking, there are plenty of opportunities for us this year. Just think of the energy transition and all the new opportunities and areas of business it is generating.
Economical and quickly ready-to-use conveyor belts#
The generously-sized support surface ensures high stability. In addition to concrete, the LTB also conveys other materials such as sand, stone chips and gravel.
Liebherr at the 28th International Exhibition for Track Technology in Münster
The usual generous use of glass and standard rear and side cameras provide an exceptional view of the working area and swing range.
Crane power for the climate revolution
Generally, it is only a matter of hours. But the reliability of the Liebherr cranes is almost perfect anyway.”
https://www.liebherr.com/en-int/n/crane-power-for-the-climate-revolution-26865-3935641
LH 40 M Port E and LH 60 M High Rise Port E: Electrifying in port handling
The LH 40 M Port E electric material handling machine is predestined for handling bulk and general cargo in port handling.
Liebherr presents its new mixing plant generation at Bauma
Liebherr presents its new mixing plant generation at Bauma Liebherr has been developing and supplying mixing plants for concrete production for more than 60 years.
Liebherr ends first half of the year with positive result
The power for the compact, electric taxi crane can be supplied from the construction site or by means of an integrated generator.







