Liebherr-Werk Biberach GmbH has managed to win several orders in Australia and New Zealand. During the last few weeks four luffing jib cranes from the HC-L series and a top-slewing crane from the EC-H series have left Liebherr-Werk Biberach GmbH for the voyage down under.
Liebherr's exclusive distributor in Australia, Morrow Equipment Co. L.L.C. based in Caringbah, NSW near Sydney, has expanded its crane fleet. Morrow continues to expand its hire fleet with the purchase of two new 542 HC-L 18/36 Litronic cranes and a used 540 HC-L model.
A 420 EC-H 16 Litronic crane is on its way to Christchurch by sea. The New Zealand government is currently rebuilding the city which was very badly damaged in the serious earthquake which struck in 2011. The rebuilding work reconstruction of the city centre will take several more years to complete, however.
The recently delivered 357 HC-L luffing jib crane is already in use in the construction of a dairy processing plant near Auckland. The 357 HC-L will primarily be used to erect prefabricated concrete components. The Micromove fine positioning mode is particularly useful for this work.

10/09/2026
Press releases
Considerate and flexible: two Liebherr NC-B cranes at work in Sai Kung
A new residential development is under construction in Ho Chung, Sai Kung. Foundation and excavation and lateral support works have been underway since December 2024 and are expected to continue until end of 2026. Two Liebherr NC-B 12-70 tower cranes are handling material logistics on the confined site.

03/09/2026
Press releases
Water for a whole valley: Liebherr Fibre crane at work high in Val Trompia
In Bovegno, Italy, work is progressing on a new drinking water treatment plant designed to supply thousands of residents and businesses across the Val Trompia region. Handling the major lifting tasks on site is a Liebherr 240 EC-B Fibre tower crane, its fourth deployment and the first of its kind to arrive in the country.

27/08/2026
Press releases
Precision over Lyon: Liebherr tower cranes conquer one of France’s most complex urban builds
Nestled between a major shopping centre and a 115 metre tower with barely room to breathe, the Ki construction site in Lyon left no margin for error. Three Liebherr EC-B flat-top tower cranes spent 14 months proving that the right technology, when precisely configured, can turn one of France's most constrained urban sites into a functioning, efficient construction operation.