
Press releases | 30/03/2017
Gulf Haulage Heavy Lift Company erects the first wind turbine in Saudi Arabia using a Liebherr LR 1750 crawler crane
- The LR 1750 proved its ability in this prestigious renewable energy project
- GHHL took responsibility for the full transport and erection of the first wind turbine in Saudi Arabia
- The Liebherr LR 1750 offers boom systems for erecting the latest generation of wind turbines
Heavy haulage and heavy lift contractor Gulf Haulage Heavy Lift Company (GHHL) has erected the first wind turbine in Saudi Arabia. A Liebherr LR 1750 crawler crane was used to erect the 84 metre tower, the 83 tonne nacelle and the 60 metre blades. The wind turbine in Turaif in the north-east of Saudi Arabia will generate power for a bulk plant facility operated by state oil company Saudi Aramco.


