
News | 07/04/2025
Bauma 2025 started: Official tour of the trade fair visits Liebherr stand
The weather was good and the mood was even better. The official fair tour of Messe München also marked the beginning of the Bauma week on the Liebherr booth.
News | 07/04/2025
The weather was good and the mood was even better. The official fair tour of Messe München also marked the beginning of the Bauma week on the Liebherr booth.
The family shareholders Jan Liebherr, President of the administrative board of Liebherr-International, and Patricia Rüf, Member of the administrative board of Liebherr-International, welcomed the political delegation around the Lord Mayor of Munich, Dieter Reiter, and Federal Minister for Construction, Klara Geywitz, as well as Minister of State for Federal and European Affairs and Media Dr Florian Herrmann in front of the mining truck T 264 Battery Electric, which was developed together with the mining customer Fortescue. With its battery-electric drive that guarantees zero emissions on site, the T 264 is an example of the Group's technology neutral approach to alternative drive technologies. The truck is also equipped with an autonomous system (Autonomous Haulage Solution), which enables driverless operation in the mine.
There was also another highlight on show, which reflects Liebherr's endeavours to help shape the construction site of tomorrow with digital solutions. The autonomous wheel loader L 550 X Power, whose autonomous system ‘Liebherr Autonomous Solutions’ was awarded the Bauma Innovation Award in the digitalisation category the evening before.
On the Liebherr booth, the fair tour was also attended by Steffen Günther, Member of the Board of Directors of Liebherr-International AG, Dr Joerg Lukowski, Director of Sales and Marketing at Liebherr-Mining Equipment Colmar SAS, Daniel Pitzer, Commercial Director of Liebherr-Werk Ehingen GmbH and Joachim Strobel, Managing Director Sales at Liebherr-EMtec GmbH.


10/09/2026
Press releases
Considerate and flexible: two Liebherr NC-B cranes at work in Sai Kung
A new residential development is under construction in Ho Chung, Sai Kung. Foundation and excavation and lateral support works have been underway since December 2024 and are expected to continue until end of 2026. Two Liebherr NC-B 12-70 tower cranes are handling material logistics on the confined site.

09/09/2026
Press releases
Darma Henwa expands fleet with 10 new Liebherr machines
In less than a year, Liebherr Indonesia has delivered a fleet of 10 machines to Darma Henwa – four R 9200 excavators and six PR 776 dozers, half of which are the Generation 8 model. These machines are currently working across the Bengalon and Kintap mines in Kalimantan.

08/09/2026
Press releases
For the construction sites of tomorrow: Hiap Heng enters the mobile construction crane market
On 2. August, the Hiap Heng Group took delivery of its first Liebherr mobile construction crane. With the MK 88-4.1E, the company is expanding its fleet with an efficient lifting solution for construction sites with limited space. The crane combines versatility with high performance and enables fast, low-emission operations on urban construction projects.