Over the next six years, the Liebherr Group is set to invest more than 200 million CHF (around 160 million euro) in its development and production site at Bulle in the Swiss canton of Fribourg. Significant capacity expansion in the fields of diesel engines and fuel injection systems will make further growth possible for the company Liebherr Machines Bulle SA.
Liebherr develops and produces diesel and gas engines, fuel injection systems, hydraulic components and splitter boxes in Bulle. These are employed partly in machines and equipment manufactured by the Liebherr Group, but are also increasingly in demand by customers outside the Group.
The assembly capacity for diesel engines will be substantially increased and the area used for engine test benches will also be made substantially larger. New machines in the area of production will not only increase capacity, but also make it possible to expand the range of parts. That is the basis for the further expansion of the engine range at Liebherr Machines Bulle SA, which currently covers six basic engines from the four-cylinder inline engine to the twelve-cylinder V-engine.
Production of Common Rail fuel injection systems, which have been manufactured in Bulle since 2012, should be increased to more than 100,000 units per year. Liebherr will thus create the necessary preconditions for reliably supplying to external customers. The new factory section for the development and production of fuel injection systems will cover an area of 9,000 m² and is due to be opened in 2016.
The modernisation of the service and logistics infrastructure with a new warehouse and logistics centre, and the expansion of the training centre will benefit all parts of the site.
With this investment, Liebherr is securing the long-term existence of the Bulle plant and the creation of new jobs. Most of them will be for qualified skilled workers in production, but many will also be for highly qualified engineers and specialists, for whom additional new offices will be created.
The investment underlines the strategic importance of the Components division within the Liebherr Group. The high depth of production can thus be sustainably maintained.
You might also be interested in

11/26/2026
Press releases
795 km/h: world record powered by Liebherr battery technology
Quantum Systems, a global drone, software and AI company, has set three new speed records for battery-powered flights with its high-speed drone, the Apex Recordhunter. In the one-way record attempt, top speeds of 795 km/h and 777 km/h were achieved, whilst in the two-way record attempt, a speed of 727 km/h over 100 metres was reached. These record-breaking achievements were also made possible due to Liebherr’s high-performance battery.

11/18/2026
Listicles
Five questions for Michael Kehrle on an award-winning journey and the future of procurement
What began with standardising processes is evolving into intelligently supported procurement. With “Three Layers. One Transformation”, Liebherr brings together harmonised processes, an established digital infrastructure and artificial intelligence in an integrated approach to transformation.

11/17/2026
News
Liebherr’s slewing bearings and drive technology: face to face with the markets of the future
From dynamic growth markets in the construction industry, through the maritime transformation up to wind energy: This year’s trade fairs highlighted diverse opportunities and challenges in the core markets of the two business units of the Liebherr’s components product segment – slewing bearings and drive technology. The following trade fair reviews illustrate the issues that are currently shaping the industries.

