Mobile and crawler cranes

4 minutes | magazine 02/2021

“We’re glad we could help”

Power Lift Tower meets Power Lift Crane

Expert for tricky hoisting work – Riga Mainz boss Uwe Langer.

Five power lift towers and a 22-axle SPMT stand ready for a static load test.

In the dynamic load test, the PLTs had to raise the 1250 tonnes all on their own.

PLTs on SPMTs move prefabricated bridge components weighing up to 1850 tonnes to their final position in their first job.

This may be of interest to you

Download

Product area mobile and crawler cranes

Our magazine