Mobile and crawler cranes

5 minutes | magazine 01/2020

“One hundred percent variable”

The crane’s wind power equipment convinced us to buy it.

Thomas Reuther, Sales Manager at Colonia

800-tonne power pack

Two Liebherr mobile cranes were used for the set-up work. Here you can see the adjustment block for the derrick guying being positioned whilst the main boom is being assembled at the rear right.

Support from Ehingen – Steffen Kiem provided support on site during the set-up work.

Thomas Reuther, Sales Manager at Colonia

Heavy duty – 400 tonnes of suspended ballast are attached to the folding frame known as the “V-Frame”.

A relaxed team – Wolfgang Winkler and Peter Severin take turns in the cab of their new Liebherr crawler crane.

A dizzying height

This may be of interest to you

Download

Product area mobile and crawler cranes

Our magazine