Mobile and crawler cranes

9 minutes | magazine 01/2022

High tech from the Kaiser’s time

Liebherr cranes reinstall repaired Rendsburg suspension ferry

Steel, steel, steel: Large rivet heads dominate the surfaces of the steel bridge structure. The impressive construction is held together by over three million rivets.

More than twice as much steel as the Eiffel Tower

Technical aesthetics or aesthetic technology: The bridge structure today is a monument and was celebrated around 110 years ago as a masterpiece of engineering.

Teamwork – Stefan Heldt, Managing Director of Wille & Dulies Krane GmbH (right) planned the crane work at the high bridge in Rendsburg along with Ralf Rohwer from the metal and steel construction contractor of the same name. Photograph: Ines Krisch / Rohwer Stahl- & Metallbau GmbH

Pulley heads extremely close to the bridge structure

Soon to be suspended again – Two Liebherr mobile cranes move the new 44 tonne gondola from the pontoon onto land. The ferry will be able to carry one hundred people and four cars. Photograph: Ines Krisch / Rohwer Stahl- & Metallbau GmbH

Sea trip – The pontoon had to undertake a journey of around 200 kilometers to get to Rendsburg. The components of the new suspension ferry were manufactured in Brake (Unterweser) over a period of two years. Photograph: Ines Krisch / Rohwer Stahl- & Metallbau GmbH

Unique – the suspension ferry in Rendsburg is the only one in the world to be suspended from a railway bridge. The gondola takes around two minutes to complete the 140 meter crossing. This photograph shows the ferry before the accident.

Space for four cars and 100 people

This may be of interest to you

Download

Product area mobile and crawler cranes

Our magazine