According to the developer, Signa Holding, five modern, sustainable office complexes with ideal public transport links are to be built on the site of the former Vienna North railway station by 2018. The campus' own infrastructure includes a hotel, a wide range of retail outlets, a conference centre, a medical centre, a kindergarten and a canteen.
The construction work on the Austria Campus is currently one of the largest projects taking place anywhere in Austria. The material excavated from the trenches, 600,000 cubic metres, is enough to fill around four million bathtubs. The total of around 20 Liebherr tower cranes in action on the site forms an impressive backdrop and ensures that around 24,000 tonnes of steel can be handled. At peak periods there are up to 2200 construction workers on the site.

13/10/2026
Press releases
Boosting performance for wind power expansion: Gertzen retrofits the LR 1800-1.0 with the X3 system
Gertzen Kranlogistik GmbH & Co. KG has retrofitted its Liebherr LR 1800-1.0 crawler crane with the X3 boom system. With this upgrade, the company is significantly expanding its range of services in the wind energy sector.

13/10/2026
Listicles
7 projects that show how varied Tower Crane Solutions projects are around the globe
From the basilica in Barcelona to the airport in Santiago de Chile. The Liebherr Tower Crane Solutions (TCS) department has been involved in some of the world’s most demanding construction projects in recent years. Seven examples show how varied these projects can be around the globe. What all the projects have in common is that they call for individual crane concepts and close collaboration with customers.

08/10/2026
Press releases
Innovative solutions for the next generation of business jets: Liebherr at NBAA-BACE 2026
At NBAA-BACE, taking place from October 20 to 22, 2026, in Las Vegas, Nevada (USA), Liebherr-Aerospace will showcase its cutting-edge innovations for the business jet market at booth no. 3555. Visitors can discover state-of-the-art systems and components, including a nose landing gear, an air-conditioning pack and modular electro-mechanical actuators.