Listicles | 10/13/2026

7 projects that show how varied Tower Crane Solutions projects are around the globe

Sagrada Família in Barcelona: a Liebherr 710 HC-L 32/64 Litronic supports the completion of the Tower of Jesus Christ.

01. Sagrada Família, Barcelona (Spain)

The Çanakkale Bridge connects Europe and Asia. Two Liebherr 357 HC-L 12/24 Litronic cranes were used for the pylons.

02. Çanakkale Bridge (Türkiye)

Liebherr L1-24 fast-erecting crane inside Passau Cathedral during the church organ restoration.

03. Church organ restoration in Passau Cathedral (Germany)

23 Liebherr tower cranes during the expansion of Santiago de Chile Airport.

04. Santiago de Chile Airport (Chile)

Liebherr 630 EC-H 40 Litronic on the 135 m tall pylon of the Kruunuvuori Bridge in Helsinki.

05. Kruunuvuori Bridge, Helsinki (Finland)

The Fehmarnbelt Tunnel between Denmark and Germany: more than 20 Liebherr tower cranes are in operation here.

06. Fehmarnbelt Tunnel: a horizontal major construction site instead of a vertical high-rise (Denmark)

The 320 m tall MoMA Tower in Manhattan. From 2015 to 2019, two Liebherr 710 HC-L 32/64 Litronic cranes were in operation here.

07. Building in the heart of Manhattan: MoMA Tower, New York (USA)

Video

Contacts

Shannon Korff, Marketing Specialist
Shannon Korff
Marketing Specialist
Liebherr-Werk Biberach GmbH Memminger Straße 120 88400 Biberach an der Riß Germany

You might also be interested in

  • How a crane operator rebuilds his working day in miniature

    10/30/2026

    News

    How a crane operator rebuilds his working day in miniature

    Crane operator Thomas Körmer has been building functional Liebherr crane models from Lego for 10 years, with no computer planning at all.

  • Built to withstand the elements: UK's first 1188 EC-H Fibre crane placed on Naval base

    10/29/2026

    Press releases

    Built to withstand the elements: UK's first 1188 EC-H Fibre crane placed on Naval base

    The UK’s first 1188 EC-H 40 Fibre tower crane has been purchased by KBS Maritime on behalf of the Royal Navy. It will serve as a permanent fixture at Portsmouth Naval Base, supporting its growth. Given its long-term operation in a challenging maritime environment, Liebherr worked closely with KBS Maritime throughout the project to develop a highly specified solution tailored to the site’s unique requirements.

  • Liebherr overcomes access restrictions to lift a Derrick crane onto a Paris high-rise roof

    10/15/2026

    Press releases

    Liebherr overcomes access restrictions to lift a Derrick crane onto a Paris high-rise roof

    A Liebherr Derrick crane has been transported piece by piece onto the roof of the Opus 12 tower in Paris La Défense, using a goods lift and a helicopter. Because the heaviest and largest components could not reach the site and the roof could not bear the load of a standard crane, Liebherr Tower Crane Solutions, Liebherr France (LDF) and the client Legendre developed this rooftop lifting solution together.