Fahrzeugkrane
Home | Legal Disclaimer
 
 
      Latest news from the
      product division:

Bauma 2007

Domestic appliances

Mobile and crawler cranes

Maritime cranes

Tower cranes

Mixing technology

Earthmoving Equipment

Mining Equipment

Aerospace

Machine Tools

Rental services

Jobs
Liebherr Group
Products
Services
Sales
Jobs
News
 
News from the mobile and crawler crane divisions
Piling and drilling rigs are put to the test on a large motorway jobsite
Click: View enlarged picture

Prior to the construction of an interchange on the A 38 motorway near Leipzig the soft building ground had to be compacted and drained with vibrated stone columns. Within seven months 42,000 vibrated stone columns between 5 and 25 m in length had to be installed.

In order to successfully install the enormous amount of stone columns in the required period, several piling and drilling rigs, type LRB 255, were used. These are equipped with a 30 m long leader as well as a rope crowd system of up to 45 t pull and push force. This high push force ensures that pipe and vibrator are always brought into a harmonic sine wave and guarantees optimum penetration of the pipes into the soil.

2005-01-07
Back to previous page
All news
Top
Print preview
Notes on use of the News area:
The list shown here provides information on current topics. The items are arranged in chronological order, with the most recent at the top.

Clicking the headline takes you directly to the detailed information.