Typical application requirements in civil engineering include mass earthmoving tasks, as well as the laying of heavy-duty pipes.
Performance criteria for these applications are:
Optimum dozing and loading outputs Precise and easy operation Extensive reaches Extensive digging depths Considerable forces at the attachment High bucket-filling factors Large payloads High slewing speeds Optimum stability of the machine