Qualification
Practical test for the new developments:
The qualification

In the qualification department, the latest developments of the competence centre are put through their paces. With internally developed qualification test setups, the components are tested under various realistic external conditions such as vibration, humidity, or lightning strokes.

Only if the result is 100% satisfactory, a new development is qualified.

  • Definition of test requirements in accordance with common standards and regulations
  • Creation of the qualification test plan and the qualification test procedure
  • Definition and construction of the qualification test setup
  • Creation of the qualification software
  • Execution of qualification tests (automation, railway technology, aerospace)
  • Creation of the qualification test reports
  • Creation of written analyses
  • Analysis and assessment of the test results
  • Creation of the acceptance test plan and the acceptance test procedure
  • Creation of the HALT/ESS/SST test plan and the HALT/ESS/SST test procedure
  • Execution of the HALT
  • EMC measuring in the own laboratory; Aerospac and CISPR 25 compliant
  • Vibration analysis
  • Execution of visual inspections

Abbreviations:

HALT Highly Accelerated Life Test

SST Stress Screening Test

ESS Environmental Stress Screening