Tower Cranes

Liebherr’s crane programme is unsurpassed in terms of versatility. It comprises machines of all systems and size categories, with the ideal lifting technology for any civil engineering task.

The highly adaptable fast-erecting cranes and the efficient top-slewing cranes have proved their worth both in the construction of residential buildings and on large-scale industrial projects all over the world.

Liebherr has developed a special tower crane that can lift loads of up to 70 tonnes for the construction of wind turbines with hub heights from 110 m in weak-wind regions.
11/05/2012

The new design of the 65 K is based on the successful concept of the 81 K, which was unveiled two years ago, and now provides a whole range of optimized and further developed functions.

30/04/2012

Liebherr is taking advantage of the 2012 ‘Intermat’ to present for the first time the new 380 EC-B 16 Litronic flat-top crane.

17/04/2012

The 2012 Liebherr RoadShow impressed around 2,000 guests at its first stop in Roppen, Tyrol (Austria).

11/04/2012

Shinwoo Development is using the new 1250 HC 40 heavy-load crane, amongst others, to build the new Samsung Electronics factory in Asan, South Korea.

23/03/2012